DENR-Wildlife, EMB, LGU requirements

Below is a complete, structured, and field-ready guide to DENR-WildlifeDENR-EMB, and LGU requirements for Agarwood farms, inoculation operations, harvesting, and export.
This is tailored for your companies (PAFC, CAPI, CESI, AGAC, COPI, etc.) and for Aquilaria malaccensis / Aquilaria spp. projects.


✅ 1. DENR-WILDLIFE (BMB & Regional CENRO/PENRO) Requirements

Primary function: Wildlife protection, CITES regulation, plantation registration, harvest permits, and transport permits.

1.1. Plantation Registration (Mandatory)

All Aquilaria (Agarwood) plantations must be registered with DENR.

Requirements:

  • Application form (from CENRO)
  • Proof of land ownership or lease
  • Location map (GPS coordinates)
  • Plantation sketch map
  • Number of trees (inventory)
  • Species identification (Aquilaria malaccensis or other spp.)
  • Photos of plantation
  • Affidavit of ownership
  • Barangay certification

Output:

✔ Certificate of Wildlife Registration (CWR) / Plantation Registration
Needed for harvest, transport, and CITES permits.


1.2. Wildlife Gratuitous Permit (If conducting R&D)

For activities such as:

  • Resin induction trials
  • Fungal inoculation (Fusarium)
  • Organogenesis research (COPI)
  • GC-MS sampling of resin

Some regions require this before allowing inoculation in field plantations.


1.3. Wildlife Local Transport Permit (WLTP)

Required when transporting agarwood trees, logs, chips, resin, oil, or seedlings from farm to another location within the Philippines.

Required:

  • Plantation registration
  • Inventory list
  • Duly inspected materials
  • Sales or transfer documents

1.4. Wildlife Export Permit (CITES Export Permit)

Required for all international exports of:

  • Chips
  • Powder
  • Oil
  • Whole logs / sections
  • Seedlings

Prerequisites:

  • Plantation registration
  • Legal Acquisition Finding (LAF)
  • Non-detriment Finding (NDF)
  • Wildlife Export Application

1.5. Non-Detriment Finding (NDF) Requirements

Usually requires:

  • Age of trees harvested (≥7–10 years)
  • Evidence of cultivation, not wild source
  • Photos of trees before/after harvest
  • Resin induction documentation

✅ 2. DENR-EMB (Environmental Management Bureau) Requirements

Primary function: Environmental impact compliance (ECC/CNC), waste management from extraction, wastewater discharge, and air quality standards.


2.1. CNC or ECC for Agarwood Plantations

CNC (Certificate of Non-Coverage)

For:

  • Pure plantations (agroforestry < 50 ha)
  • Non-processing farms

ECC (Environmental Compliance Certificate)

Required if:

  • Plantation area ≥ 50 hectares
  • Processing/extraction facility is present
  • Chemical storage or wastewater discharge involved
  • You operate a Supercritical CO₂ extraction facility (CESI)
  • You conduct fermentation, distillation, oil extraction

Requirements:

  • Project description
  • Site development plan
  • Soil and watershed impact
  • Environmental Management Plan (EMP)
  • Solid waste & effluent management
  • Community consultations / Barangay Resolution

2.2. PCO (Pollution Control Officer) Accreditation

For facilities like:

  • Extraction lab
  • Distillation site
  • SCCO₂ extraction plant
    Mandatory to have a designated Pollution Control Officer.

2.3. Hazardous Waste Generator Registration

If using:

  • Solvents
  • Cleaning chemicals
  • CO₂ cylinders (industrial-grade)
  • Lubricants or equipment oils

CESI must register under RA 6969.


2.4. Wastewater Discharge Permit

Extraction facilities must secure:

  • Discharge Permit
  • Quarterly effluent testing (DENR-accredited laboratory)

2.5. Air Pollution Permit (Permit to Operate)

Applies if you operate:

  • Boilers
  • Furnaces
  • Distillation heaters
  • CO₂ compressors

✅ 3. LGU (Barangay, Municipal/City, Provincial) Requirements

LGUs control local business operationsland-use approval, and community permissions.


3.1. Barangay Clearance

For:

  • Plantation establishment
  • Extraction facility
  • Warehouse/storage site
  • Transport of agarwood within the barangay

Often needed to support DENR applications.


3.2. Business Permit / Mayor’s Permit

Required for:

  • Farm operation (agroforestry)
  • Oil extraction facility
  • Nursery production
  • Trading/export office

Must be renewed annually.


3.3. Zoning Clearance / Locational Clearance

LGU Planning Office verifies:

  • Land is suitable for agroforestry
  • Extraction site is approved for industrial/light industry use

Typically precedes an ECC application.


3.4. Building Permit & Occupancy Permit

Required if constructing:

  • Nursery infrastructure
  • Storage & warehouses
  • Extraction laboratories
  • SCCO₂ building

3.5. Provincial Environmental Office (if applicable)

Some provinces require:

  • Provincial Environmental Compliance
  • Additional monitoring for agroforestry projects

🔰 4. Summary: What Each Agency Covers

AgencyWhat They RegulateApplies to
DENR-BMB (Wildlife)Plantation registration, CITES, harvest, transportAll farms & exporters
DENR-EMBECC/CNC, wastewater, air emissions, hazardous wasteExtraction & large plantations
LGU (Barangay/City/Prov.)Local permits, zoning, business clearancesAll facilities & operations

🔰 5. What YOUR Companies Specifically Need

For PAFC / CAPI (Plantations)

  • DENR Plantation Registration
  • CNC (if < 50 ha) or ECC (if ≥ 50 ha)
  • Barangay Clearance + Business Permit
  • WLTP (when moving harvested material)

For CESI (Supercritical CO₂ Extraction)

  • ECC (mandatory due to processing)
  • PCO Accreditation
  • Hazardous Waste Registration
  • Wastewater Discharge Permit
  • Air Pollution Permit
  • Business Permit, Zoning Clearance

For AGAC (Farmers Cooperative)

  • Plantation registrations for members
  • Consolidated WLTP for shipments
  • LGU-based cooperative registration

For Exporting Chips or Oil

  • CITES Wildlife Export Permit
  • NDF + LAF
  • WLTP
  • ECC/CNC depending on facility
  • Business Permit
  • Packing List & Invoice

🔰 If you want, I can prepare:

📌 A full consolidated requirements checklist
📌 Step-by-step application flowchart (DENR Wildlife → EMB → LGU → Export)
📌 Templates:

  • Barangay endorsement letter
  • DENR LOI for plantation registration
  • ECC project description
  • CITES export application letter
  • Environmental Management Plan (EMP)

Would you like these prepared?